Current Transformer CT: Ratio, Class and Burden

A current transformer CT scales a 4,000 A fault down to 5 A for the relay. IEC 61869-2:2012 governs the class on the nameplate. Get the ratio, the class and the burden right and the instrument outlives the panel. Get one wrong and the relay makes a bad decision at the moment the system needs a good one.

Written by Leon Zhang, protection application engineer. Reviewed by the relayprotect.com engineering team. Updated October 29, 2026.

At a Glance

  • A current transformer ct divides a large primary current into a 5 A copy for the relay and the meter.
  • The ratio is the turns: 400:5 needs 80 secondary turns against one primary turn.
  • The class is the promise: 0.2S meters near the working point, 5P20 protects into the fault.
  • Burden is a loop budget in ohms: a 15 VA rating at 5 A is 0.6 ohm of total resistance.
  • Four families, one physics: ring, window, bar and split core, each matched to a mounting.
  • An open secondary is the one unforgivable error: short S1 to S2 before any wire moves.
  • The relay on the other side of the lead is a ct relay: coil, armature and a trip contact.
  • IEC 61869-2:2012 governs the CT; IEC 60255-1:2022 governs the relay it feeds.

Current Transformer CT Families: Four Bodies, One Physics, IEC 61869-2

Every current transformer ct on a switchgear enquiry is one of four bodies. The physics is the same in all of them: a core that carries the flux, a winding that sets the ratio, an insulation that holds the primary voltage off the terminal. What changes is how the primary gets into the core, and that choice decides the job the unit can do.

The four current transformer ct families: ring, window, bar and split core, with typical mounting notes.
Figure 1. The four CT families: ring, window, bar and split core, with mounting notes.
FamilyPrimaryTypical classMounting
Ring (wound)Solid conductor, a few turns0.2S to 5P20New panel, fixed wiring
WindowThe busbar or cable passes once10P, 0.5Retrofit, limited room
Bar primaryA copper bar, integral5P20, 10P20Medium-voltage cubicle
Split coreClamps over a live cable0.5, 1.0Field measurement, trending

Table 1. The four current transformer families and where each belongs.

The split core is the family that earns a reputation for inaccuracy, and it is not the winding that is the problem. It is the gap. Two mating faces that do not close cleanly add reluctance, and a rusty joint adds more every year. A split core is right for trending a feeder and wrong for billing one.

Selecting a relay for a live project?

Send the system voltage, CT ratio and tripping scheme. Our engineers confirm the model and reply within 12 hours.

View relay modelsRequest a quote

The Three Parts That Decide the Answer

Behind every nameplate there are three physical parts doing the work. The core is a ring or a pair of laminated bars that carry the flux. The winding is enameled copper laid around the core, and its turn count is the ratio. The insulation holds the primary voltage off the secondary terminal. A core that saturates early bends the curve, a winding that short-circuits a few turns drifts the ratio, and an insulation that discharges quietly will eventually puncture and put an earth fault on the secondary. Each part fails in its own way, and each failure shows up as a different reading on the meter.

PartWhat it doesFailure that hides there
Magnetic coreCarries the flux at a density under 1.5 TSaturates early, ratio bends at high current
Secondary windingSets the ratio, 80 turns for 400:5Turn-to-turn short, low ratio, hot winding
Insulation systemHolds the primary voltage off the terminalPartial discharge, then an earth fault

Table 5. The three physical parts of a current transformer and the failure each hides.

The working density stays well under 1.5 T so the magnetising current is small and the ratio is honest. A core that is asked to carry more than that saturates, and the secondary stops growing while the primary keeps climbing. The knee point on the nameplate is where that bend arrives, and the accuracy limit factor is the multiple of rated current at which the bend must not have started yet.

The knee point is the number that sets the accuracy limit factor. The trip coil on the relay side is the last device in the loop the CT has to keep honest. An interlock on the secondary test link adds contact resistance, and an inrush event on the transformer side is the fault a differential scheme must ignore while the CT keeps its promise. Each of those words appears on the nameplate or the drawing.

Choosing the Ratio: Load First, Fault Second

The ratio is set by two currents that never meet. The first is the continuous load, and it decides the primary so the secondary never runs hot.

The second is the fault level, and it decides the accuracy limit factor. Pick the primary from the load, then let the fault finish the number.

StepInputDecision
Rated primaryContinuous load plus 20 percent marginNearest standard ratio, 200:5 or 400:5
Accuracy limit factorExpected fault multiple, 10 to 30 times5P10, 5P20 or 5P30
Secondary currentDistance of the panel run5 A nearby, 1 A on a long run
BurdenRelay coil plus the whole lead loop15 VA or 30 VA

Table 2. How the two currents choose the ratio on a 12 kV feeder.

A CT with a primary that is too low saturates under its own load and tells the meter a lie it will not explain. One that is too high runs the secondary so light that the relay barely stirs at the working point. The margin, not the minimum, is what makes the instrument honest.

Current Transformer CT Class: What the Number on the Nameplate Promises

The class is the promise, and the promise has two halves. The first is the error, a percentage. The second is the range, a multiple of rated current the percentage holds to. A 5 P20 unit holds five percent of error up to twenty times rated. A 0.2S unit holds 0.2 percent near the working point and is never asked about the fault region at all. The letter P is what divides the two jobs, and it is the one mark you must not miss when reading the nameplate.

Band chart of CT accuracy classes 0.2S to 5P20, 10P20 and PX, with each class mapped to its typical use.
Figure 2. Where each accuracy class lives on the nameplate, metering and protection.

On the protection side the class works with the fault level of the circuit it guards. A feeder that faults at five times rated is fine with a 5 P10. The same feeder, backed by a bus that carries ten times that, wants the 5 P20. The class and the fault multiple must agree, or the relay sees a fault it has already undersized.

The promise has a range as well as a percentage. A 5 P20 unit holds five percent of error up to twenty times rated, and a 10 P20 unit holds ten percent up to the same multiple. The range is where the class earns its keep, because a meter that is honest at one time rated is not honest at twenty. The class is the number the relay is rated against, and a 5 P20 relay on a 5 P10 CT will read the fault at five times rated and start to drift, while the same relay on a 5 P20 CT stays inside its promise. The range is the part of the number that must not be shortened, and it is the one that is written on the nameplate as the accuracy limit factor.

Current Transformer CT Burden and the Loop That Costs It

Burden is the only number on the CT that belongs to the installation, not the factory. It is the apparent power the secondary has to push through the relay coil, the test link, every terminal and both legs of the lead. A 15 VA rating at 5 A works out to 0.6 ohm, and the copper in the wall spends a large share of it before the relay has drawn anything. Figure 3 is where the budget actually goes on a realistic loop.

Stacked bar showing how a 15 VA CT burden splits across the relay coil, test link and lead wire.
Figure 3. Where a 15 VA burden actually goes: relay, test link, lead.

The remedy is not a bigger CT. It is a shorter loop, a larger lead, or a 1 A secondary that asks one fifth of the voltage drop of the same wire. The choice belongs on the drawing, not on the nameplate.

The loop is where the budget is actually spent. A 4 mm2 copper conductor runs about 0.0044 ohm per metre. A 60 m round-trip lead costs 0.53 ohm before the relay has drawn a single milliamp.

A 100 m run spends 0.44 ohm on the lead alone. The 1 A secondary is the honest answer on a long run: one fifth of the current, one fifth of the drop. The trade is a finer winding and a slightly higher unit cost.

The ct relay Side: Where the 5 A Lands

The 5 A leaving S2 ends at a ct relay on the back of the relay cabinet. The element that matters is the coil and the burden it presents, and that burden is a real number in ohms that counts against the same 0.6 ohm budget the lead is already eating. A modern relay with a 0.5 VA input is easy on the loop; an older 10 VA electromechanical unit eats the whole budget by itself and is why the lead was run thick.

The wiring rules on that side are short and unforgiving. Earth the secondary at one point only, at the panel end. Short S1 to S2 before the wire moves. Mark both ends of the lead so a polarity fault shows up as a test result, not a misoperation. A ct relay that reads its class against an open circuit is not a relay, it is a kilovolt source.

Meter and Protection on the Same Busbar

One current transformer ct cannot serve both jobs well, because the two jobs want different promises. The meter wants 0.2S honesty near the working point and does not care about the fault. The protection wants a 5 P20 that stays inside five percent when the primary is twenty times the load and does not care about the working point at all. The answer on a new design is usually a dual-core CT, one core for each job, each rated for the work it actually carries.

Where retrofit forces a single core, the split is a compromise: the meter class is chosen at the working point, and the protection is given a smaller, honest role as backup. The alternative is a second, window CT clamped over the same conductor for the relay, with the meter left on the panel unit.

The dual-core design is the one that survives an audit, because each core carries only the job it was rated for. The meter core runs at 0.2S, and the protection core runs at 5 P20, and the two never argue with each other. The physical unit is a single casting with two independent secondaries, and the only difference between it and two separate CTs is the cost of one housing instead of two. On a new design it is the purchase that saves a panel space, and on a retrofit it is the answer that does not ask for the cable to be moved.

DesignWhen it worksWhen it does not
Dual-core, one castingNew design, panel space is tightTwo very different fault levels, one core saturates while the other is fine
Two separate CTsRetrofit, one job per conductorThe two secondaries must run the same length, or the classes drift apart

Table 7. Dual-core versus single-core, where each belongs.

Choosing the Right CT for a New Installation

The selection is four decisions, made in order, and Figure 4 is the flow. Skip one and the unit that arrives will be the wrong one for the job that pays for it. Load sets the primary. The job, metering or protection, sets the class. The lead run closes the burden. The loop check is the one that catches the spec before it reaches the cabinet.

Decision tree for choosing a current transformer: continuous load, metering or protection, then the loop check.
Figure 4. Choosing the right CT: four decisions before the specification.

A new feeder is the moment to run the specification from scratch, and the four decisions fit on one page.

The order of the four decisions matters. Pick the class before the burden and the specification is honest. Pick the burden before the class and the unit that arrives is the wrong one for the fault level it will see. The load current sets the primary, and the fault multiple sets the accuracy limit factor, and the two numbers together choose the class. The lead run then closes the burden, and a 1 A secondary is the answer on a long run. The loop check at the end is the one that catches the specification before it reaches the cabinet, and it is the one that is worth doing twice: once on the drawing, once on the panel.

How Current Transformers Fail, and How to Catch It

The failures are slow, then sudden. A winding that short-circuits a few turns drifts in ratio over months and nobody notices until a metering audit. Insulation that discharges quietly punctures in a switching surge. A terminal screw that was never torqued burns through a summer of load. The open secondary is the one that the team owns: it is the error, and it is the one that kills.

SymptomLikely causeFirst check
Ratio error at high current onlyTurn-to-turn short-circuitSecondary resistance against the nameplate
Burnt terminal, sharp smellLoose screw, high contact resistanceThermographic scan under load
Earth fault on the secondaryInsulation punctureInsulation resistance at 500 V
Nuisance trip on motor startReversed polarity or wrong classPolarity flick test, class review
Open circuit alarm, no currentBroken wire or open test linkContinuity with the secondary shorted

Table 3. The common CT failures, ranked by how often they reach the panel.

Testing Before You Energize

Five checks catch nearly everything. Measure the secondary resistance and compare it with the nameplate or a sister unit. Prove polarity with a DC pulse. Measure insulation at 500 V and expect well over 100 M ohm on a dry casting. Measure the loop resistance to confirm the burden budget. Then inject primary current at 100 percent of rated and read the secondary. The last step is the one that is skipped, and it is the one that hides a knee that is arriving early.

CheckMethodPassing value
Secondary resistanceMicro-ohm meter against the nameplateWithin 5 percent of the factory value
PolarityDC pulse, watch the needleAgrees with the dot mark on the terminal
Insulation resistance500 V megger, secondary to earthWell over 100 M ohm on a dry casting
Loop resistanceMillivolt method on the full leadInside the 0.6 ohm budget for a 15 VA unit
Ratio at 100 percentPrimary injection, secondary readingInside the class, at the accuracy limit factor

Table 6. The five commissioning checks on a new current transformer, in order.

The last row is the one that matters on a feeder with a high fault level. A CT that saturates gracefully still has to survive the thermal duty, and a 25 kA for one second is a common site specification. The check that catches it is not the low-current one. It is the injection at 100 percent of rated and, where the set allows, at the accuracy limit factor. A ratio that passes at low current and bends at the knee is the one the site will find on a fault, and it is the one the commissioning test should have caught before the panel was energised.

Selecting a model for this scheme? Send the voltage level, CT/VT ratios and your relay list. An engineer returns a model mapping and quotation within 12 hours →

When a New CT Is the Wrong Answer

Not every accuracy complaint is a purchasing decision, and ordering a new unit is the most expensive way to find that out. Five situations argue for stopping before the spanners are ordered.

  • When the ratio error appears only above the knee: that is a burden or class issue, so re-check the loop resistance before you blame the winding.
  • When the meter reads low but primary injection is correct: the fault sits in the wiring or the test link, not inside the casting.
  • When the unit is oil-filled and the site has no oil handling: open it and you own an environmental incident as well as a failed CT.
  • When the panel is still energised and the secondary cannot be shorted: no reading is worth an open circuit at 12 kV.
  • When the class was wrong from the start: a 5 P10 cannot be repaired into a 5 P20, and a purchase decision is cheaper than a teardown.

Standards Behind the Nameplate

The instrument side now rests on one family. IEC 61869-1:2023 carries the general requirements and the test list, and IEC 61869-2:2012 adds the specific requirements for current transformers, the 5 P and 10 P classes and the accuracy limit factor. Low power passive units follow IEC 61869-10:2017. On the relay side, IEC 60255-1:2022 sets the general requirements for protection equipment, and ANSI/IEEE C37.2:2022 fixes the device numbers that name each function on the drawing. One family, one document, and the edition on the certificate is the line that closes the enquiry.

StandardEditionCoverage
IEC 61869-12023General requirements, dielectric and partial discharge tests
IEC 61869-22012Current transformers, 5 P and 10 P classes, accuracy limit factor
IEC 61869-102017Low power passive current transformers
IEC 60255-12022Measuring relays and protection equipment
ANSI/IEEE C37.22022Device function numbers on the protection drawing

Table 4. Standards cited on a CT specification and on the relay drawing.

The merger that matters at tendering is the one that brought IEC 61869-1 and IEC 61869-2 under one family. The 2007 edition of 61869-1 is replaced, and the 61869-2 requirements for current transformers now sit in the same document family as the general dielectric and partial discharge tests. Low power passive units follow 61869-10:2017, and the digital interface for instrument transformers is 61869-9. Quoting the edition on the certificate is the line that closes the enquiry, and the one that catches a supplier who has shipped the 2007 edition into a 2023 specification.

Conclusion: What the Nameplate Tells You

A current transformer ct is a passive instrument with four numbers that decide what the relay sees: the ratio, the class, the burden and the accuracy limit factor. Size the primary from the load, match the class to the fault, close the loop on the burden and short the secondary before the wire moves. Get those four right and the unit outlives the panel it was fitted to. Get one wrong and the relay makes the decision the system needed, but with the wrong number in hand.

The instrument is quiet. The only voice it has is the number on the nameplate, and the one on the test link. Read both. A current transformer ct is not a device that fails loudly. It fails by drifting, and the drift shows up as a meter that reads low or a relay that trips when it should not. The four numbers on the nameplate are the entire specification, and the one on the test link is the one that decides whether the secondary is honest at the moment the fault arrives. Read both, and the instrument will outlive the panel it was fitted to.

Frequently Asked Questions

What is a current transformer CT in plain terms?

It is the instrument that divides a large primary current by a fixed ratio and hands the relay or meter a 5 A or 1 A copy. The core and winding do the scaling, the insulation keeps the primary voltage off the terminal, and the class on the nameplate is the promise about how honest that copy is during a fault.

What is the difference between a 5 P20 and a 0.5 CT?

The 0.5 unit is a meter: it holds 0.5 percent ratio error near rated current. The 5 P20 unit is a protector: it holds 5 percent composite error up to 20 times rated current. Ask one to do the other job and it fails the other promise. Many panels run both on the same busbar.

Why must a CT secondary never be left open?

With the primary energised and the secondary open, there is nothing opposing the primary ampere turns, so the core saturates and the collapsing flux drives a sharp voltage across the gap. Short S1 to S2 at the test block before you pull any wire. That is the single rule on the secondary side.

How do I pick the ratio for a new feeder?

Start from the continuous load, not the fault. The rated primary of a current transformer ct covers the load plus margin, and the accuracy limit factor is chosen so the relay still reads inside its class at the fault level you expect. Check the loop and burden before you seal the enquiry.

What does the relay class ct number on a nameplate mean?

It is the accuracy class, for example 5 P20 or 0.2S, printed with the ratio and the burden. The class tells you the composite error the unit promises at a multiple of rated current. A protection class keeps the promise into the fault region; a metering class keeps it near the working point.

Can one CT serve both metering and protection?

Rarely, and only where the load and the fault are close together. The two jobs want different classes, and a dual-core CT is the usual answer: one core for the meter, one for the relay, each rated for the job it actually carries.

How long can the secondary lead run be?

The run is a budget, not a habit. A 4 mm2 loop at 100 m already spends 0.44 ohm of a 0.6 ohm budget, and the relay has not drawn a milliamp. Where the panel is far, drop to a 1 A secondary and the same copper reaches further.

What does a CT test at commissioning catch?

Five things: secondary resistance against the nameplate, polarity with a DC pulse, insulation at 500 V, the loop resistance that confirms the burden, and ratio at 100 percent of rated. The last one is the one that is skipped, and it is the one that hides a knee that is arriving early.

The two numbers that must match on the same purchase order

CT secondary current rating and relay current input rating are the two numbers that have to agree, and on one project they did not: the site CTs were 5 A secondary, the transformer differential relay was the 1 A variant. Both items were correct on their own datasheets, which is exactly why it passed review. Put them on the same line of the bill of materials: CT ratio and secondary rating, relay input rating, and the setting sheet reference. Where the plant is 1 A throughout, the relay must be ordered as the 1 A variant; where 5 A CTs already exist, an interposing CT or the correct input module is the answer, not a compensating setting. The plants these schemes were installed in are in the project record.

Field record

The CTs we specify sit in networks from 10 kV underground mine distribution in Tajikistan to a 220 kV generation plant auxiliary system in Pakistan. The most common band by far is 33-110 kV: Sakaka and Al-Jalamid in Saudi Arabia, mine and industrial substations across Myanmar, and a 33 kV substation automation system in Iraq. The ratio is always chosen against the fault level at that busbar, which is why we ask for the single-line diagram before quoting. See the project record for the full country list.

If the selection has to be checked against your switchboard, send the single-line and the ratings.

Working on a similar scheme? Send the single-line diagram, relay list and CT/VT data. Quote in 12 hours →

About Author
Leon Zhang
Hello, I'm Leon Zhang. I have 15 years of experience in the power relay protection industry with extensive pre-sales and after-sales project experience. Our company specializes in various complete sets of relay protection and automation equipment. I can assist customers in solving all practical on-site project challenges and provide optimal integrated solutions.
Tell Us Your Requirement
Send an Inquiry

High Quality

Stable performance, reliable design, ensuring safe operation for power system protection and grid stability.

Fast Delivery

Timely delivery to support your urgent orders and project schedules efficiently and professionally at any time.

Best Warranty

Professional Warranty: Reliable after-sales support for stable relay protection and long-term customer satisfaction.