Project Record: 93 Installations in 43 Countries

This page documents 93 protection relay and panel installations delivered in 43 countries, from 6 kV industrial feeders to 220 kV utility substations. The April 2025 3 MW rooftop PV plant in Hebei is used first as a worked example: it shows what a full secondary-equipment scope looks like from enquiry through to joint commissioning with two dispatch centres. The country-by-country project record follows below.

In April 2025 we supplied and commissioned all of the secondary equipment for a 3 MW rooftop photovoltaic plant at the Hebei Tiefeng Environmental Protection Science and Technology Park. The plant was energised and connected to the grid on 28 April 2025, after joint communication commissioning with both the prefecture-level and the county-level dispatch centres.

Project at a Glance

ClientHebei Tiefeng Environmental Protection Science and Technology Park, Hebei Province, China
PlantRooftop photovoltaic, 3 MW
ScopeAll secondary equipment for the PV plant: protection, monitoring and communication
Our workComplete layout and engineering of the distributed PV monitoring system, supply of the devices, and on-site communication commissioning
Grid interfaceJoint commissioning with prefecture-level dispatch and county-level dispatch
Connected28 April 2025
Schedule driverThe owner needed the plant connected before the 30 April policy cut-off for the tariff in force at the time
OutcomeCommissioning completed and the plant connected within the required window

What “All Secondary Equipment” Covers

On a grid-connected PV plant the primary equipment – modules, inverters, transformers, switchgear – is only half of the installation. Everything that measures, protects, signals and reports is secondary equipment, and the plant cannot be energised until that layer has been proven against the grid operator’s requirements. On this project the scope covered three functions:

  • Protection at the point of connection and on the collector circuits, including the interfaces the grid operator requires at the point of common coupling.
  • Monitoring of the distributed PV plant as a whole – inverter status, string and combiner data, metering, alarms – presented in one system rather than a set of independent boxes.
  • Communication to the dispatch centres, which is where most PV projects lose time.

Why Dual-Dispatch Commissioning Is the Real Schedule Risk

In China a distributed plant of this size reports to two dispatch centres at once: the prefecture-level centre and the county-level centre. Each has its own point list, its own signal naming and its own acceptance procedure. A plant can be physically complete and still be unable to connect because one of the two centres has not accepted the telemetry and telecontrol signals.

That is why the April deadline was a commissioning problem before it was an equipment problem. The work that has to be finished before the connection date is the point-by-point verification of every analogue value, every status signal and every control command against both dispatch point lists, followed by the communication test itself. When those items are left to the week of the deadline, the deadline is missed.

How the Dates Were Met

The sequence that made 28 April achievable was:

  1. The monitoring and communication architecture was fixed first, so the device list and the point lists could be agreed with both dispatch centres before hardware arrived on site.
  2. Devices were supplied against that fixed architecture rather than being re-specified during installation.
  3. Communication commissioning with the two dispatch centres was treated as its own work package with its own test record, not as the last item on the electrical commissioning list.

This is the same sequence we apply to export projects, where the equivalent risk is a utility or an EPC contractor whose interface specification arrives late.

What This Means for a Buyer Outside China

The technical content of the job is not unusual: protection at the point of connection, monitoring across a distributed plant, and a communication link to a control centre. What the project demonstrates is the part that is hard to buy from a catalogue – getting an interface specification agreed, and getting a third party to accept signals against it on a fixed date.

If your project has a utility interface, a dispatch or SCADA point list, or a fixed connection date, send the single-line diagram and the point list with your enquiry. The protection functions and the device configuration can be settled against the documents before any hardware is ordered.

Project Track Record

This is the delivered record behind the catalogue: 93 completed projects in 43 countries outside China. Not enquiries, not framework agreements – substations and plants where our relays and panels are in service. The voltages run from 6 kV industrial distribution up to 220 kV substations, across mining, steel, cement, oil and gas, ports, utilities, renewables and commercial buildings.

Projects are listed by country. Client names are available on request under a reference agreement, because most of these installations are owned by utilities and industrial groups that do not publish their suppliers.

Jump to a country: Myanmar, Vietnam, Indonesia, Laos, Thailand, Cambodia, Philippines, Malaysia, Pakistan, Bangladesh, Nepal, Bhutan, India, Tajikistan, Kazakhstan, Kyrgyzstan, Azerbaijan, Armenia, Turkmenistan, Lebanon, Oman, Saudi Arabia, Qatar, United Arab Emirates, Iraq, Bahrain, DR Congo, Nigeria, South Africa, Angola, Egypt, Ethiopia, Ghana, Tanzania, Zambia, Russia, Germany, Turkey, Bolivia, Brazil, Mexico, Mongolia, South Korea.

Southeast Asia: 33 projects in 8 countries

CountryProjectsVoltageRepresentative application
Myanmar1035-110 kVMine and industrial substations, cement plant, 4 x 7500 kW hydro station
Vietnam86-110 kVSteel plants, hydro stations, 2 x 600 MW thermal plant, mine substations
Indonesia420-150 kVJakarta power plant; thermal plant automation; hydro stations
Laos322-35 kVWater treatment plant expansion and pumping station, Vientiane; coal mine substation
Thailand322-115 kVBangkok commercial district; industrial estate drainage pumping; steel mill substation
Cambodia222-35 kVCoastal resort; provincial grain storage
Philippines213.8-34.5 kVWholesale market and hotel, Metro Manila
Malaysia111 kVHotel tower, Kuala Lumpur

South Asia: 7 projects in 5 countries

CountryProjectsVoltageRepresentative application
Pakistan311-220 kVHotel and airport distribution, Islamabad; generation plant auxiliary systems
Bangladesh111 kV5 x 2000 kW captive generation, Jamuna Group
Nepal112 kVDistribution room, Patan
Bhutan111 kVGolf course development, Thimphu
India111 kVDeva hydro power plant

Central Asia and the Caucasus: 10 projects in 6 countries

CountryProjectsVoltageRepresentative application
Tajikistan310-110 kVPakrut and Hamadoni substations; underground mine distribution
Kazakhstan26-35 kVRiver pumping station; non-ferrous metal smelter, Almaty region
Kyrgyzstan135 kVGold mine processing plant substation
Azerbaijan235 kVNational university, Baku; Caspian oil and gas facility
Armenia110 kVDepartment store, Yerevan
Turkmenistan135 kVOil and gas processing plant

Middle East and the Gulf: 12 projects in 7 countries

CountryProjectsVoltageRepresentative application
Lebanon311-15 kVPort power distribution and cargo terminal, Beirut and Tripoli
Oman311-33 kVPort distribution centre and urban refurbishment, Muscat; hotel
Saudi Arabia233-110 kVSubstations, Sakaka and Al-Jalamid
Qatar166 kVSubstation
United Arab Emirates111 kVHigher education campus, Abu Dhabi
Iraq133 kVSubstation automation system
Bahrain111 kVDate palm plantation distribution, Manama

Africa: 17 projects in 9 countries

CountryProjectsVoltageRepresentative application
DR Congo611-33 kVSubstations, hydro station, sulphuric acid plant, 6 MW waste heat power, copper-cobalt mine
Nigeria333 kVPlateau State substation; Abuja cold storage; paper mill
South Africa211-33 kVFootball stadium power supply, Johannesburg and Mbombela
Angola160 kV11,000 V grid connection station, Luwango
Egypt111 kVProduction line power distribution
Ethiopia115 kVElectrical testing facility, Addis Ababa
Ghana133 kVCement plant substation
Tanzania135 kVSteel plant substation
Zambia133 kV2 x 150 MW power plant, Soke

Europe: 5 projects in 3 countries

CountryProjectsVoltageRepresentative application
Russia235-110 kVSubstations, Ussuriysk and Novopu
Germany110 kV2 x 7 MW coal generating unit
Turkey233 kVDistrict heating; waste-to-energy plant retrofit, Antalya

The Americas: 3 projects in 3 countries

CountryProjectsVoltageRepresentative application
Bolivia16 kVCement grinding station, EP project
Brazil113.8 kVFood factory, Kraft confectionery plant
Mexico134.5 kVSubstation, Mexico City

East Asia: 6 projects in 2 countries

CountryProjectsVoltageRepresentative application
Mongolia435 kVOyu Tolgoi copper mine phases 1 and 2; Khovd city substation
South Korea222-154 kVSongdo business district; tidal power station

Three countries account for the largest share: Myanmar (10 projects, mostly 35 kV mine and industrial substations), Vietnam (8, steel plants and hydro stations) and DR Congo (6, mining and chemical plants). That concentration is typical of export work – a first project in a country is usually followed by others once the panel builder or EPC contractor has used the equipment once.

What the Track Record Shows

Mining is the largest single sector. Copper, gold, coal and polymetallic mines in Mongolia, Myanmar, Kyrgyzstan, Laos, DR Congo and Tajikistan. Mine power systems are hard on protection: long feeders, frequent starts, poor power quality and a maintenance team that needs the relay to tell them what happened. Most of these orders were 35 kV substations feeding a processing plant.

Industrial plants of every kind. Steel mills in Vietnam and Tanzania, cement plants in DR Congo and Cambodia, a confectionery factory for a global food group in Brazil, a paper mill in Nigeria, a waste-heat generator at a copper-cobalt mine. In each case the relay panel had to fit an existing switchboard and an existing SCADA.

Utilities and transmission. 66 kV, 110 kV and 220 kV substations for state utilities, including protection and control panels rather than relays alone. These are the projects where the documentation matters as much as the hardware: type test reports, IEC 61850 models, FAT and SAT records.

Renewables and distributed generation. Hydro stations from 4 x 7500 kW to grid-scale, a 2 x 600 MW thermal plant, tidal generation in Korea, waste-to-energy in Turkey. The anti-islanding and reverse power functions in our range come from this work, and from the standard we helped to write.

Commercial and public buildings. Stadiums in South Africa, ports in Lebanon and Oman, airports and hotels in Pakistan, universities in Azerbaijan and the UAE. Smaller projects, but they are where the LV product range gets its field record.

How to Check Any Claim on This Page

Certificates can be verified independently, and we prefer buyers to do it:

  • ISO 9001:2015 – certificate 41925Q10467-06R0S. ISO 14001 and ISO 45001 certificates are issued by the same body and scanned on our quality and certifications page.
  • Standards – seven Chinese national and energy industry standards we contributed to, listed with their numbers on the same page. They can be looked up in the national standards database.
  • Project references – for a tender, we will provide two or three references in the same sector and voltage level, with a contact who has agreed to be called.
  • Type test reports – issued by third-party laboratories, available as PDF under NDA or on request.

Reviewed by the relayprotect.com engineering team. Country, voltage level and project type for each entry come from the delivery record; the certificates behind these projects are listed on the quality certifications page.

Related Pages

The relay families behind these projects

Setting and wiring errors we have caught on live projects, and how each was found before anything was damaged: field notes.

High Quality

Stable performance, reliable design, ensuring safe operation for power system protection and grid stability.

Fast Delivery

Timely delivery to support your urgent orders and project schedules efficiently and professionally at any time.

Best Warranty

Professional Warranty: Reliable after-sales support for stable relay protection and long-term customer satisfaction.