Send an Inquiry

Protection Relays for Metallurgy and Steel Plants

Arc Furnaces, Drives and Harmonics

A steel plant is the harshest electrical load in heavy industry: arc furnaces draw an unstable, highly distorted current, rolling mill drives start and stop against enormous inertia, and the plant usually runs its own generation in parallel with the utility. Three problems follow.

Harmonics and reactive power push the power factor and the busbar voltage out of the range the utility allows. Capacitor banks installed to correct the power factor resonate with the system inductance and fail. And when a supply transformer trips, the motors that must keep turning – conveyors, cooling water pumps, fume extraction – need the load transferred to the standby incomer before the process stops.

Devices We Supply for Steel and Metallurgical Plants

Bus Transfer Is a Protection Decision

Fast bus transfer has to check the phase angle and the residual voltage before closing, or the standby transformer takes the full motor back-EMF on top of its own inrush. Done correctly, the motors ride through; done as a simple interlock, the transfer itself trips the line. The ABT and 83B devices perform that check as part of the transfer sequence.

Harmonics Need Measurement, Not Guesswork

Before specifying a filter or a detuned reactor, measure. The APQ-9100H records the harmonic spectrum, the flicker and the unbalance over time, which is what the design office needs to size the correction equipment correctly instead of oversizing it.

Send the Single-Line and the Harmonic Study

Send the single-line diagram, the furnace or drive ratings and any harmonic measurement you already have to our engineering team and we will return the recommended device list with the resonance and transfer settings.

Common Specifications

Ambient operating range-25 to +55 °C
Rated frequency50 / 60 Hz
Routine testingIEC 60255 routine tests on every unit before shipment
CommunicationIEC 61850, Modbus RTU / TCP where specified on the datasheet
MountingPanel, rack or switchgear cubicle, per product
CertificationCE; quality system certified to ISO 9001:2015

Ordering and Documentation

Minimum order quantity is 1 unit. Standard lead time is 7 to 15 working days, with EXW, FOB, CIF or DDU terms as agreed on the quotation. Every order ships with the datasheet, manual, connection diagram and factory routine test report matched to the exact model and firmware version. See Technical Downloads for the document set and Quality and Certifications for the CE certificate, ISO 9001:2015 certificate and type test reports.

OEM and ODM supply is available: branding, labelling, document sets and enclosure details are agreed in writing before production. All equipment carries a 12-month warranty against manufacturing defects.

Send the single-line diagram, CT/VT ratios and the protection functions you need to our engineering team and we will return the matching configuration, documents and quotation.

High Quality

Stable performance, reliable design, ensuring safe operation for power system protection and grid stability.

Fast Delivery

Timely delivery to support your urgent orders and project schedules efficiently and professionally at any time.

Best Warranty

Professional Warranty: Reliable after-sales support for stable relay protection and long-term customer satisfaction.