-
Leon Zhang Sales Manager
-
Email: sale@relayprotect.com
-
Phone/WhatsApp: +86 13655813266
50/51 Overcurrent Setting Worksheet
This worksheet turns your transformer or feeder data into a 50/51 overcurrent setting: the pickup, the operating time for the curve you pick, and the instantaneous stage. Every number is a live formula, so you can change one value and watch the times move.
What the sheet works out
- Max load current from the equipment rating and the rated voltage
- 51 pickup from an overload factor you set, in primary and secondary amps
- Operating times at 1.5, 2, 3, 4, 5, 7, 10, 15, 20, 30 and 40 times pickup
- IEC 60255-151 curves: standard, very, extremely and long time inverse, plus definite time
- 50 instantaneous pickup from the minimum fault at the end of the zone
- Three automatic checks: I>> clear of load, I>> inside the zone, pickup below the CT primary
What is inside the workbook
- Input – five sections, yellow cells only, about two minutes to fill
- Results – the time current table and the setting to apply at the relay
- Curves – all four inverse curves side by side so you can compare shapes before committing to a TMS
- Checklist – ten checks to run before the setting sheet is issued
- Notes – the curve constants and what the sheet does not cover
What it does not replace
It is a calculation aid. It does not replace a coordination study, the relay manual, or your utility requirements. Fault levels, CT behaviour, arc resistance and system earthing all change the final numbers, and grading against the relays above and below you still has to be checked by hand.
Get the worksheet
Send the form below and the download link appears on the next page. The email and the message box are the only required fields.
If the setting has to be right the first time, send the single line diagram, the CT ratios and classes, the relay model and the fault level. We work the sheet through and send it back with the pickup, curve, TMS and instantaneous element filled in, normally within 12 hours.
